top of page
hidden ramp 
 Foldable ramp 
 HIDDEN SCISSOR RAMP 
hinged rampS

Telescopic ramps; embedded in concrete, especially in container loading hinged ramps for situations where the tongue is not enough for the longer tongue is preferred ramps. 

 

Telescopic ramps are very useful and long-lasting ramps that make up the forklift and transpalet path by making the ramp and contractor setting their own, which do not need to be made back and forth to the contractors due to the adjustment of the language on the ramp after the contractors approach the ramp.

mobile rampS

Minimum 8 tons and the maximum carrying capacity is designed according to the demand of our customers 

The length of the standard mobile ramps is 10.25 meters while the length of the tail part folded is 7.50 meters. 

The front wing part of the ramp, that is, the bodies that provide the transition to the

vehicle are made of 13/14 draped tear drop pattern sheet. 

The benefit of this is to minimize the gliding event while working in open weather.

It operates in the height range of 100-160 cm and is adjusted according to the vehicle height, whether by Jack tool or by hydraulic system means according to customer demand. 

The benefit of this is to minimize the gliding event while working in open weather.

Mobile load platforms mobile ramps 2-4-6 or multiples of this process with Jacks in the form of. Jack numbers are determined according to the desired working tonnage.

The carrying capacity of each jack is 25 tons and 4 jacks are used for 8 ton mobile ramps and 2 10 ton mobile ramps.

As mentioned, if hydraulic system is requested according to the demand of our customers, front wings and 2-meter tail can be used by hand pump or hydromotor with height adjustment.

platforms

Telescopic ramps; embedded in concrete, especially in container loading hinged ramps for situations where the tongue is not enough for the longer tongue is preferred ramps. 

 

Telescopic ramps are very useful and long-lasting ramps that make up the forklift and transpalet path by making the ramp and contractor setting their own, which do not need to be made back and forth to the contractors due to the adjustment of the language on the ramp after the contractors approach the ramp.

bottom of page